Project Features/Highlights
Overview:
Current Progress
Site Construction and Progress: · Landscaping – currently working on handicap ramp and stair at east lane and water feature (south wall of water trough), Children's Courtyard; and building temporary handicap access across existing water feature so that area west of Eighties Restaurant can begin. · Backfilling – currently bringing up west end of library to rough grade. · Stair #5 structure: suspended slab complete; only curb and small wall left to form and pour. · Concrete block: only Pump Room remains. · Brick veneer: now installing brick on east elevation. · Structural steel: installation of miscellaneous metals in various areas ongoing. · Rough carpentry: only Stair #4 and east canopies remain. · Wood door and window frames: installation ongoing. · Millwork: installation progressing. Most pieces are fabricated and will follow carpet installation. · Roofing: TPO membrane complete; flashings nearing completion. · Exterior cladding: north wall complete; only loading dock soffit remains. · Metal Panels: work is progressing well; only Stair #4 and east canopies remain. · Horizontal membrane: plaza work nearing completion. · Spray insulation: complete on Level P1. · Curtain wall: complete except for a few flashings (waiting for brick & stone to be installed). · Misc. Glazing: started in parkade; atrium glass starting end of month. · Folding partition: track in place and door will follow carpet installation. · Drywall: complete. · GWB Ceilings: only small portion remains at main floor by elevators. · Acoustic & metal ceilings: T-bar is in on all levels; panel installation has started on all levels. · Wood ceilings: installation started on Level 1. · Carpet tile: installation is currently on Level 2. · Stone: stone treads installed at Stair #3. · Porcelain tile: floor tile complete on all areas except Lobby Level 1. · Painting: at various stages of completion on L1, L2, and L3; painters started in parkade. · Elevators #1 and #2: cabs are nearing completion. · Solar panels: installation is complete. · Mechanical & Electrical: finishing work is wrapping up. · Commissioning: well under way and progressing well. Project Description
Project Description:
|
Contact
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |